On July 19, 1999, Kosovo power plants, destroyed by the Serbian army, resumed work. Following the return of Albanian specialists and workers, in cooperation with KFOR forces, a block of Kosovo A power plant was set up. Kosovo’s Tecet works on the basis of coal, whose massive reserves are known in the world.
You may also like
-
2 September 1500, the oldest Albanian school opened outside the country, in Venice
-
2 September 1858, at the request of Said Toptani, was opened in Tirana secular schools
-
2 September 1878, the League of Prizren, asks Mehmet Ali Pasha leave
-
2 September 1892, was born Dom Lazer Shantoja, clergyman and writer
-
2 Shtator 1909, u çel “Normalja” e Elbasanit; e para shkollë e mesme pedagogjike