On February 11th, 1927 was inaugurated the new road Fier-Berat. A day later was inaugurated other road, that connected Fieri with Mallakastra. The ceremony was attended by the Presidency of the Senate and some local authorities from Tirana too.
On February 11th, 1927 was inaugurated the new road Fier-Berat. A day later was inaugurated other road, that connected Fieri with Mallakastra. The ceremony was attended by the Presidency of the Senate and some local authorities from Tirana too.